logo

k-deck aluminium slab formwork with Early Stripping Drop Head

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


How KITSEN Aluminum Formworks Dismantled

| When dismantling the slab formworks, start with the slab beam, open the lock between the beam and panels first. When removing the beams, remove the panels part by part. The prop head are used to carry the slab concrete and cannot be removed, nor can it be shaken and displaced, to minimize collision.

Gulf Construction Online - Meva systems help Iranian

The slabs are poured using the MevaDec slab formwork applying the drop|head|beam|panel method_ The drop head allows for early stripping: that is the props remain under the poured slabs while the panels and beams can be removed early for the next slab_ Thus the site needs two sets of props but only one set of panels and beams to do all the slab ___

Slab Formwork - Aluminum Formwork System

Modular Slab Formwork System · Modular slab formwork system is uniquely designed for faster erection and stripping. · Modular panel 1.2*1.8m&1.2*1.5m can be erected by 3 men without the tower crane. · Early stripping drop head with shoring props can be left to support the slab after stripping the slab modular panels.

Slab Formwork - Aluminum Formwork System

Modular Slab Formwork System ; Modular slab formwork system is uniquely designed for faster erection and stripping_ ; Modular panel 1_2*1_8m&1_2*1_5m can be erected by 3 men without the tower crane_ ; Early stripping drop head with shoring props can be left to support the slab after stripping the slab modular panels_

DROP HEAD POST HANDSET SHORING SYSTEM Atlas

Atlas A`DECK is a drop`head post shore handset shoring system designed to maximize labor productivity and reduce formwork cycle time! The primary components include high capacity post shores with drop heads, aluminum girders and LVL joists! The Atlas A`DECK system provides a high level of productivity through the use of a 8’ x 6’

Green Formwork Steel Panel-Prop Formwork System with Early

Steel Formwork| Aluminium Formwork| Fast Formwork for Construction manufacturer / supplier in China| offering Green Formwork Steel Panel-Prop Formwork System with Early Stripping Mechanism| Kwikstage/Kwickstage/K-Stage Scaffolding| Steel and Aluminum Green Formwork for Slab Concrete and so on_

Scaffolding and Formwork panel systems Aluminum slab panels

Scaffolding and Formwork panel systems Aluminum… Scaffolding and Formwork panel systems Aluminum slab panels · Brand· Cmax· Article No· 3CFS0218143· Supplier ID · A01·

How KITSEN Aluminum Formworks Installed

Set position steel bars| Use steel bars welded on the vertical steel bars of the wall /column as the positioning point when installing_ the height is 40·60mm from the floor` and the spacing does not exceed 800mm_ the internal corner position must ensure at least one positioning bar in each direction_ The length of the positioning steel bar shall be equal to or smaller than the cross section of !!!

Slab formwork MevaDec - MEVA Formwork

The MevaDec drop head (lowers the primary beams and panels by 19 cm) makes early stripping possible. thus allowing optimised material stock on the construction site as well as rapid construction progress. The beams and panels can be stripped effortlessly and used for the next pouring cycle. It is thus possible to complete a slab in three days.